Question- Consider the following statements about Kerala Silverline ProjeCT-
(1) It links Kerala’s southern end and state capital Thiruvananthapuram with its northern end of Kasaragod.
(2) The line is proposed to be 529.45 kms long, covering 11 districts.
(3) The project is being executed by the Kerala Rail Development Corporation Limited (KRDCL).
Select the correct answer using the code given below-
(a) Only 2 and 3
(b) Only 2
(c) Only 1 and 3
(d) All of the above
Ans. (d)
Related facts-
- It is Kerala’s flagship a semi high-speed railway corridor through the state linking its southern end and state capital Thiruvananthapuram with its northern end of Kasaragod.
- The line is proposed to be 529.45 kms long, covering 11 districts through 11 stations.
- When the project is realised, one can travel from Kasaragod to Thiruvananthapuram in less than four hours on trains travelling at 200 km/hr. The current travel time on the existing Indian Railways network is 12 hours.
- The deadline for the project, being executed by the Kerala Rail Development Corporation Limited (KRDCL), is 2025. KRDCL, or K-Rail, is a joint venture between the Kerala government and the Union Ministry of Railways.
- The project, estimated to cost Rs 63,940 crore, is billed as one of the biggest infrastructure enterprises being pushed by the ruling Left Democratic Front (LDF) government.
- The project will have trains of electric multiple unit (EMU) type with preferably nine cars and extendable to 12 cars each.
- A nine-car rake can seat a maximum of 675 passengers in business and standard class settings.
- The trains can run at a maximum speed of 220 kmph on standard gauge track, completing journeys in either direction in under four hours.
By- Yogesh Pratap singh