Government Launches Scheme for setting up 1000 MW CTU- connected Wind Power Project

Government Launches Scheme for setting up 1000 MW CTU- connected Wind Power Project

Question: Recently Ministry of New and Renewable Energy (MNRE) has launched Scheme for setting up Wind Power Project connected to transmission network of Central Transmission Utility (CTU) of how much Mega watt?
(a) 2000 MW
(b) 1000 MW
(c) 1500 MW
(d) 500 MW
Ans:(b)
Related facts:

  • On 15 June 2016 Ministry of New and Renewable Energy (MNRE) has launched Scheme for setting up of 1000 MW Wind Power Project connected to transmission network of Central Transmission Utility (CTU).
  • The scheme was launched with the objective to facilitate supply of wind power to the non-windy states at a price discovered through transparent bidding process.
  • Ministry has designated Solar Energy Corporation of India (SECI) as nodal agency for implementation of the scheme.
  • The Government of India has set an ambitious target of achieving 175 GW power capacity from renewable energy resources by 2022 and out of this 60 GW has to come from wind power.
  • The Scheme will be implemented for setting up 1000 MW capacity of CTU connected Wind Power Projects by Wind Project Developers on build, own and operate basis.
  • The present wind power installed capacity in the country is nearly 26.7 GW sharing around 9% of total installed capacity.
  • India is at 4th position in term of wind power installed capacity after China, USA and Germany.
  • The Wind power potential in the country is assessed by the National Institute of Wind Energy (NIWE) at 100 meter above ground level, which is estimated to be over 302 GW.

Reference:
http://pib.nic.in/newsite/PrintRelease.aspx?relid=146194
http://mnre.gov.in/file-manager/UserFiles/Draft-Wind-1000MW-Guidelines.pdf