Tata : Transmission project in Bangladesh

Tata Transmission project in Bangladesh

Question : In which country has ‘Tata Projects’ recently(November 2021) bagged transmission project ?
a. Bangladesh
b. Bhutan
c. Nepal
d. Srilanka
Ans. a.
Related facts —

  • ‘TATA Projects’ has recenlty(November 2021) announced that the company has forayed into Bangladesh’s Transmission & Distribution sector by securing a 400 KV double circuit transmission line project.
  • It is the project of Power Grid Company of Bangladesh Limited (PGCB) valued at approximately Rs 900 crore.
  • This 120-km length project from Barapukuria to Bogura has been secured on turnkey basis.
  • The project will be executed in 30-months and funding shall be done by EXIM Bank India under Indian Line of Credit.
  • The transmission line shall result in expansion of high voltage transmission infrastructure in the northern parts of Bangladesh.
  • It will also facilitate 1600 MW power transmission from Power Plant based in Jharkhand to Bangladesh.

Link:
https://economictimes.indiatimes.com/industry/energy/power/tata-projects-bags-transmission-project-in-bangladesh/articleshow/87648985.cms