{"id":88887,"date":"2019-12-30T13:51:43","date_gmt":"2019-12-30T13:51:43","guid":{"rendered":"https:\/\/www.edristi.in\/?p=88887"},"modified":"2019-12-30T13:51:47","modified_gmt":"2019-12-30T13:51:47","slug":"first-trial-run-of-double-stack-train","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/first-trial-run-of-double-stack-train\/","title":{"rendered":"First Trial Run of Double Stack Train"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Question: On which section the first trial run of Double Stack Train was flagged off on December 27 2019?<br> (a) Rewari-Madar <br> (b) Khurda-Bilaspur<br> (c) Raipur-Cherrapunji<br> (d) None of These<br> Answer: (a)<br> Related facts:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>On December 28, 2019, a trial run of the first freight train was conducted on the newly built Rewari-Madar section of Western Dedicated Freight Corridor (WDFC).<\/li><li>The train was flagged off by Dedicated Freight Corporation India Limited (DFCIL).<\/li><li>The Rewari-Madar section is in Haryana State (for approximately 79 Km in Mahendragarh &amp; Rewari districts) and Rajasthan State (for approximately 227 Km in Jaipur, Ajmer, Sikar, Nagaur &amp; Alwar districts).<\/li><li>Total cost of works on this section is Rs. 3918 Crore, excluding land.<\/li><li>The opening of this stretch will benefit various industries in Rewari \u2013 Manesar, Narnaul, Phulera &amp; Kishangarh areas of Rajasthan &amp; Haryana.<\/li><li>In its roadmap to ensure faster delivery, DFCCIL will run freight trains at the maximum speed of 100 Kmph hour as against the current maximum speed of 75 kmph.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Links:<br><a href=\"https:\/\/pib.gov.in\/newsite\/PrintRelease.aspx?relid=196164\">https:\/\/pib.gov.in\/newsite\/PrintRelease.aspx?relid=196164<\/a><\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question: On which section the first trial run of Double Stack Train was flagged off on December 27 2019? (a) Rewari-Madar (b) Khurda-Bilaspur (c) Raipur-Cherrapunji (d) None of These Answer: (a) Related facts: On December 28, 2019, a trial run of the first freight train was conducted on the newly built Rewari-Madar section of Western [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":88894,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1121],"tags":[],"class_list":["post-88887","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nnews"],"_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/88887","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=88887"}],"version-history":[{"count":0,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/88887\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/88894"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=88887"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=88887"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=88887"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}