{"id":69649,"date":"2019-02-27T13:41:03","date_gmt":"2019-02-27T13:41:03","guid":{"rendered":"https:\/\/www.edristi.in\/?p=69649"},"modified":"2019-02-27T13:41:09","modified_gmt":"2019-02-27T13:41:09","slug":"cabinet-approves-patna-metro-rail-project","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/cabinet-approves-patna-metro-rail-project\/","title":{"rendered":"Cabinet approves Patna Metro Rail Project"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Question: Recently the Union Cabinet has approved Patna Metro Rail Project having two Metro Rail Corridors. Name the two stations between which one of the Metro Rail Project runs? <\/strong><br>(a) Danapur to Mithapur <br>(b) Jahanabad to Darbhanga <br>(c) Muzaffarpur to Madhubani <br>(d)  Arrah to Chhapra <br><strong>Answer: (a) <br>Related facts: <\/strong><\/p>\n\n\n\n<ul><li>On 13<sup>th<\/sup> February,\n2019, Union Cabinet headed by Prime Minister Narendra Modi has approved Patna\nMetro Rail Project having <strong>two <\/strong>Metro\nRail Corridors, namely(i) <strong>Danapur to Mithapur<\/strong> (ii) <strong>Patna Railway Station to New ISBT (<\/strong><strong>Inter State Bus Terminus)<\/strong> at an estimated cost of Rs 13,365.77\ncrore.<\/li><li>The Projectwill be completed in <strong>5\nyears.<\/strong> <\/li><li>Danapur Cantt to Mithapur corridor\nwill pass through the heart of city and connect densely populated areas such as\n<strong>Raza Bazar, Secretariat, High Court, and\nLaw University Railway Station. <\/strong><\/li>\n<script async=\"\" src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script>\n<ins class=\"adsbygoogle\" style=\"display:block; text-align:center;\" data-ad-layout=\"in-article\" data-ad-format=\"fluid\" data-ad-client=\"ca-pub-7086827700842303\" data-ad-slot=\"2662621974\"><\/ins>\n<script>\n     (adsbygoogle = window.adsbygoogle || []).push({});\n<\/script>\n<li>The length of Danapur to Mithapur\ncorridor is<strong> 16.94 km,<\/strong> which is\nmostly underground (11.20 km) and partly elevated (5.48 km) and comprises of <strong>11 Stations (3-Elevated and 8-Underground).<\/strong><\/li><li>Patna Jn. to ISBT corridor will\nconnect <strong>Gandhi Maidan, PMCH, Patna\nUniversity, Rajendra Nagar, Mahatma Gandhi Setu, Transport Nagar and ISBT.<\/strong> <\/li><li>The length of Patna Station to New\nISBT corridor is <strong>14.45 km,<\/strong> which is\nmostly elevated (9.9 km) and partly underground (4.55 km) and comprising of <strong>12 stations (9-Elevated and 3-Underground).<\/strong><\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Links:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=188587\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (opens in a new tab)\">http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=188587<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question: Recently the Union Cabinet has approved Patna Metro Rail Project having two Metro Rail Corridors. Name the two stations between which one of the Metro Rail Project runs? (a) Danapur to Mithapur (b) Jahanabad to Darbhanga (c) Muzaffarpur to Madhubani (d) Arrah to Chhapra Answer: (a) Related facts: On 13th February, 2019, Union Cabinet [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":69651,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[1143],"tags":[],"class_list":["post-69649","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pp"],"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/phvHKS-i7n","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.edristi.in\/wp-content\/uploads\/2019\/02\/planning-projectCabinet-approves-Patna-Metro-Rail-Project.jpg?fit=300%2C168&ssl=1","_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/69649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=69649"}],"version-history":[{"count":0,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/69649\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/69651"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=69649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=69649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=69649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}