{"id":69645,"date":"2019-02-27T13:36:02","date_gmt":"2019-02-27T13:36:02","guid":{"rendered":"https:\/\/www.edristi.in\/?p=69645"},"modified":"2019-02-27T13:36:08","modified_gmt":"2019-02-27T13:36:08","slug":"cabinet-approves-ahmedabad-metro-rail-project-phase-ii","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/cabinet-approves-ahmedabad-metro-rail-project-phase-ii\/","title":{"rendered":"Cabinet approves Ahmedabad Metro Rail Project Phase II"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Question: What is the total length of Ahmedabad Metro Rail Project (Phase II), recently approved by Union Cabinet? <\/strong><br>(a) 23.635 km <br>(b) 38.254 km <br>(c) 28.254 km <br>(d) 32.234 km <br><strong>Answer: (c) <br>Related facts:<\/strong><\/p>\n\n\n\n<ul><li>On 19 February 2019, Union Cabinet\nchaired by Prime Minister Narendra Modi approved proposal for developing two\ncorridors for the purpose of Metro Rail Project Phase II. <\/li><li>Implementation of the project will\nprovide the much-needed additional public transport infrastructure to Ahmedabad\nand Gandhinagar.<\/li>\n<script async=\"\" src=\"\/\/pagead2.googlesyndication.com\/pagead\/js\/adsbygoogle.js\"><\/script>\n<ins class=\"adsbygoogle\" style=\"display:block; text-align:center;\" data-ad-layout=\"in-article\" data-ad-format=\"fluid\" data-ad-client=\"ca-pub-7086827700842303\" data-ad-slot=\"2662621974\"><\/ins>\n<script>\n     (adsbygoogle = window.adsbygoogle || []).push({});\n<\/script>\n<li>Implementation of Ahmedabad Metro Rail Project\nPhase-II, includes two corridors of total length 28.254 at a total completion\ncost of Rs. 5384.17 crores.<\/li><li><strong>Corridor 1<\/strong> extends from&nbsp;<strong>Motera&nbsp;Stadium&nbsp;to\nMahatma&nbsp;Mandir<\/strong>&nbsp;for a length of 22.838 km. <\/li><li><strong>Corridor 2 <\/strong>extends from <strong>GNLU to GIFT City<\/strong> for a length of 5.416\nkm.<\/li><\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Links:<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=188789\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (opens in a new tab)\">http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=188789<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong> <\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question: What is the total length of Ahmedabad Metro Rail Project (Phase II), recently approved by Union Cabinet? (a) 23.635 km (b) 38.254 km (c) 28.254 km (d) 32.234 km Answer: (c) Related facts: On 19 February 2019, Union Cabinet chaired by Prime Minister Narendra Modi approved proposal for developing two corridors for the purpose [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":69647,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[1143],"tags":[],"class_list":["post-69645","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pp"],"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/phvHKS-i7j","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.edristi.in\/wp-content\/uploads\/2019\/02\/planning-projectCabinet-approves-Ahmedabad-Metro-Rail-Project-Phase-II.jpg?fit=299%2C168&ssl=1","_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/69645","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=69645"}],"version-history":[{"count":0,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/69645\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/69647"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=69645"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=69645"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=69645"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}