{"id":51756,"date":"2018-07-03T07:35:54","date_gmt":"2018-07-03T07:35:54","guid":{"rendered":"https:\/\/www.edristi.in\/?p=51756"},"modified":"2018-07-03T07:35:54","modified_gmt":"2018-07-03T07:35:54","slug":"delhi-meerut-expressway","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/delhi-meerut-expressway\/","title":{"rendered":"Delhi-Meerut Expressway"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Question- Recently, Prime Minister Narendra Modi dedicated the Delhi-Meerut Expressway to the nation. In this regard which one of the given is not true?<\/strong><br \/>\n(a) This expressway is 14 lanes from Nizamuddin Bridge to Delhi-Uttar Pradesh border.<br \/>\n(b) \u00a0Up to the 27.74 km length the expressway will be 14 lanes and the remaining will be of 6 lanes.<br \/>\n(c) This will be the second expressway on which there will be cycle path on the block at about 28 km from Delhi to Dasna.<br \/>\n(d) The project was laid on December 31, 2015 by Prime Minister Modi.<br \/>\n<strong>Answer: (c)<\/strong><br \/>\n<strong>Related Facts:-<\/strong><\/p>\n<ul style=\"text-align: justify;\">\n<li>On May 27, 2018 Prime Minister Narendra Modi dedicated the Delhi-Meerut Expressway to the nation.<\/li>\n<li>14-lane of Delhi-Meerut Expressway is the first accessed phase, which extended from Nizamuddin Bridge to Delhi-Uttar Pradesh border.<\/li>\n<li>The construction cost of this 8.360 km part of the length is about Rs. 841.50 crores.<\/li>\n<li>It includes 6-lane expressway and 4-4 service lanes on both sides.<\/li>\n<li>The project was laid by the Prime Minister on December 31, 2015.<\/li>\n<li>This expressway aims to provide fast and secure connectivity between Delhi and Meerut and Uttar Pradesh and Uttarakhand.<\/li>\n<li>The total length of this project is 82 km. upon which initially the 27.74 km length will be of 14 lanes while there will be the remaining 6 lane expressway.<\/li>\n<li>The estimated cost of this project is Rs. 4975.17 crores.<\/li>\n<li>This will be the first Express on which there will be a cycle path on the block about 28 km between Delhi and Dasna.<\/li>\n<li>This project will have 11 flyover \/ interchange, 5 large and 24 small bridges, three rails over bridges, 36 vehicles and 14 underpass passes for pedestrians.<\/li>\n<li>On completion of the project, it will take only 60 minutes to travel from Delhi to Meerut.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><strong>Reference: <\/strong><br \/>\n<a href=\"http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=179561\" target=\"_blank\" rel=\"noopener\">http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=179561<\/a><br \/>\n<a href=\"http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=179570\" target=\"_blank\" rel=\"noopener\">http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=179570<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question- Recently, Prime Minister Narendra Modi dedicated the Delhi-Meerut Expressway to the nation. In this regard which one of the given is not true? (a) This expressway is 14 lanes from Nizamuddin Bridge to Delhi-Uttar Pradesh border. (b) \u00a0Up to the 27.74 km length the expressway will be 14 lanes and the remaining will be [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":50314,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1121],"tags":[2344],"class_list":["post-51756","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nnews","tag-national"],"_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/51756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=51756"}],"version-history":[{"count":0,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/51756\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/50314"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=51756"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=51756"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=51756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}