{"id":23205,"date":"2017-03-10T08:15:09","date_gmt":"2017-03-10T08:15:09","guid":{"rendered":"https:\/\/www.edristi.in\/?p=23205"},"modified":"2017-03-10T08:15:09","modified_gmt":"2017-03-10T08:15:09","slug":"cabinets-approval-hydro-electric-project","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/cabinets-approval-hydro-electric-project\/","title":{"rendered":"Cabinet&#8217;s approval for Hydro Electric Project"},"content":{"rendered":"<p><strong>Question : In which of the following countries the hydro power project named \u2018Arun-III\u2019 will be set up?<\/strong><br \/>\n(a) India<br \/>\n(b) Bhutan<br \/>\n(c) Nepal<br \/>\n(d) Myanmar<br \/>\n<strong>Answer: (c)<\/strong><br \/>\n<strong> Related Facts:<\/strong><\/p>\n<ul>\n<li>On 22nd February, 2017, the Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi approved proposal for generation component of Arun-3.<\/li>\n<li>\u2018Arun-III\u2019 is a 900 MW Hydro Electric Project, in Nepal.<\/li>\n<li>The project is located on Arun River in Sankhuwasabha District of Eastern Nepal.<\/li>\n<li>The estimated cost for this project is Rs. 5723.72 crore.<\/li>\n<li>Completion period of the project shall be 60 months from the date of financial closure which is planned for September 2017.<\/li>\n<li>The project is implemented by Satluj Jal Vidyut Nigam (SJVN) Limited which is a Central Public Sector Enterprises of Government of India.<\/li>\n<li>SJVN Limited ( a Mini Ratna: Category-I and Schedule \u2013\u2018A\u2019 CPSE company under Ministry of Power, Govt. of India) is a joint venture of the Government of India ( with 64.46% shares) ) and the Government of Himachal Pradesh (with 25.51% shares).<\/li>\n<li>SJVN Arun-3 Power Development Company Pvt. Ltd (SAPDC) was incorporated &amp; registered on 25th April, 2013 as a private limited company under the Nepalese Companies Act.<\/li>\n<li>The power from the project shall be exported from Dhalkebar in Nepal to Muzaffarpur in India.<\/li>\n<\/ul>\n<p><strong>Reference:<\/strong><br \/>\n<a href=\"http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=158627\" target=\"_blank\">http:\/\/pib.nic.in\/newsite\/PrintRelease.aspx?relid=158627<\/a><br \/>\n<a href=\"http:\/\/sjvn.nic.in\/project-details.htm?13\" target=\"_blank\">http:\/\/sjvn.nic.in\/project-details.htm?13<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question : In which of the following countries the hydro power project named \u2018Arun-III\u2019 will be set up? (a) India (b) Bhutan (c) Nepal (d) Myanmar Answer: (c) Related Facts: On 22nd February, 2017, the Cabinet Committee on Economic Affairs chaired by the Prime Minister Shri Narendra Modi approved proposal for generation component of Arun-3. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":23016,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1143],"tags":[2497],"class_list":["post-23205","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pp","tag-planning-project-en"],"_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/23205","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=23205"}],"version-history":[{"count":0,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/23205\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/23016"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=23205"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=23205"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=23205"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}