{"id":13683,"date":"2016-07-15T11:36:47","date_gmt":"2016-07-15T11:36:47","guid":{"rendered":"https:\/\/www.edristi.in\/?p=13683"},"modified":"2016-07-15T11:36:47","modified_gmt":"2016-07-15T11:36:47","slug":"bangladesh-india-sign-agreement-joint-coal-fired-power-plant","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/bangladesh-india-sign-agreement-joint-coal-fired-power-plant\/","title":{"rendered":"Bangladesh and India sign agreement for joint coal fired power plant"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Question: Recently Bangladesh and India signed an agreement for the construction of a 1,320 megawatt coal fired power plant. The estimated cost of the project is-<\/strong><br \/>\n(a) $1.68 billion.<br \/>\n(b) $1.78 billion.<br \/>\n(c) $2.68 billion.<br \/>\n(d) $3.00 billion.<br \/>\n<strong>Ans: (a)<\/strong><br \/>\n<strong>Related facts:<\/strong><\/p>\n<ul>\n<li style=\"text-align: justify;\">On 12 July 2016 Bangladesh and India has signed an agreement for the construction coal fired power plant.<\/li>\n<li style=\"text-align: justify;\">The capacity of the thermal power plant will be 1,320 megawatts.<\/li>\n<li style=\"text-align: justify;\">The National Thermal Power Corporation of India and the Bangladesh Power Development Board (BPDB) signed a Joint Venture Agreement to build a 1,320 MW coal-fired thermal power plant.<\/li>\n<li style=\"text-align: justify;\">It will be known as Maitree Super Thermal Plant, at Rampal in Bangladesh\u2019s Bagherhat district.<\/li>\n<li style=\"text-align: justify;\">Bharat Heavy Electricals Ltd (BHEL) was awarded the contract after being identified as \u201ctechnically qualified and financially competitive\u201d.<\/li>\n<li style=\"text-align: justify;\">India&#8217;s Exim Bank will provide $1.49 billion for the project.<\/li>\n<li style=\"text-align: justify;\">It is scheduled to start generating power in 2019.<\/li>\n<\/ul>\n<p><strong>Reference:<\/strong><br \/>\n<a href=\"http:\/\/bdnews24.com\/economy\/2016\/07\/13\/bangladesh-india-sign-rampal-power-plant-construction-agreement\" target=\"_blank\">http:\/\/bdnews24.com\/economy\/2016\/07\/13\/bangladesh-india-sign-rampal-power-plant-construction-agreement<\/a><br \/>\n<a href=\"http:\/\/economictimes.indiatimes.com\/industry\/energy\/power\/bangladesh-and-india-sign-agreement-for-joint-coal-fired-power-plant\/articleshow\/53179712.cms\" target=\"_blank\">http:\/\/economictimes.indiatimes.com\/industry\/energy\/power\/bangladesh-and-india-sign-agreement-for-joint-coal-fired-power-plant\/articleshow\/53179712.cms<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question: Recently Bangladesh and India signed an agreement for the construction of a 1,320 megawatt coal fired power plant. The estimated cost of the project is- (a) $1.68 billion. (b) $1.78 billion. (c) $2.68 billion. (d) $3.00 billion. Ans: (a) Related facts: On 12 July 2016 Bangladesh and India has signed an agreement for the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13652,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[1151],"tags":[2346],"class_list":["post-13683","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-tta","tag-treaty-agreements"],"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/phvHKS-3yH","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.edristi.in\/wp-content\/uploads\/2016\/07\/Bangladesh-and-India-sign-agreement-for-joint-coal-fired-power-plant.jpg?fit=300%2C192&ssl=1","_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/13683","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=13683"}],"version-history":[{"count":0,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/13683\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/13652"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=13683"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=13683"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=13683"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}