{"id":12192,"date":"2016-06-04T12:11:11","date_gmt":"2016-06-04T12:11:11","guid":{"rendered":"https:\/\/www.edristi.in\/?p=12192"},"modified":"2016-06-04T12:11:11","modified_gmt":"2016-06-04T12:11:11","slug":"dpr-varanasi-metro-rail-project-approved","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/dpr-varanasi-metro-rail-project-approved\/","title":{"rendered":"DPR of Varanasi metro rail project approved"},"content":{"rendered":"<p style=\"text-align: justify\"><strong>Question: Recently, Uttar Pradesh government approved the Detailed Project Report(DPR) of the Metro Rail Project for which of the following district?<\/strong><br \/>\n(a) Kanpur<br \/>\n(b) Varanasi<br \/>\n(c) Agra<br \/>\n(d) Merrut<br \/>\n<strong>Ans:(b)<\/strong><br \/>\n<strong>Related facts:<\/strong><\/p>\n<ul style=\"text-align: justify\">\n<li>On 31 May 2016 the Uttar Pradesh (UP) cabinet approved the Detailed Project Report (DPR) of Varanasi Metro rail project.<\/li>\n<li>The DPR of Varanasi Metro was finalised in February 2016 by LMRC in coordination with Government of India\u2019s engineering consultancy company, specializing in the field of infrastructure, RITES Limited.<\/li>\n<li>According to the DPR, the 29.23 km Metro will have two corridors that include from BHEL to Banaras Hindu University(BHU) (19.35 km) and Benia Bagh to Sarnath (9.885 km).<\/li>\n<li>17 stations between BHEL and BHU have been proposed while there would be nine stations between Beniyabagh and Sarnath.<\/li>\n<li>There will be 26 stations, 20 underground and six elevated in the two corridors.<\/li>\n<li>The estimated cost of the project would be Rs 13,133 crore.<\/li>\n<\/ul>\n<p style=\"text-align: justify\">\n<strong>Reference:<\/strong><br \/>\n<a href=\"http:\/\/www.business-standard.com\/article\/pti-stories\/dpr-of-varanasi-metro-rail-project-approved-116053101589_1.html\" target=\"_blank\">http:\/\/www.business-standard.com\/article\/pti-stories\/dpr-of-varanasi-metro-rail-project-approved-116053101589_1.html<br \/>\n<\/a><br \/>\n<a href=\"http:\/\/timesofindia.indiatimes.com\/city\/varanasi\/DPR-of-Varanasi-metro-rail-project-approved\/articleshow\/52524139.cms\" target=\"_blank\">http:\/\/timesofindia.indiatimes.com\/city\/varanasi\/DPR-of-Varanasi-metro-rail-project-approved\/articleshow\/52524139.cms<\/a><br \/>\n<a href=\"http:\/\/economictimes.indiatimes.com\/industry\/transportation\/railways\/detailed-project-report-of-varanasi-metro-rail-project-approved\/articleshow\/52526360.cms\" target=\"_blank\">http:\/\/economictimes.indiatimes.com\/industry\/transportation\/railways\/detailed-project-report-of-varanasi-metro-rail-project-approved\/articleshow\/52526360.cms<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question: Recently, Uttar Pradesh government approved the Detailed Project Report(DPR) of the Metro Rail Project for which of the following district? (a) Kanpur (b) Varanasi (c) Agra (d) Merrut Ans:(b) Related facts: On 31 May 2016 the Uttar Pradesh (UP) cabinet approved the Detailed Project Report (DPR) of Varanasi Metro rail project. The DPR of [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":12141,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1143],"tags":[],"class_list":["post-12192","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pp"],"_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/12192","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=12192"}],"version-history":[{"count":0,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/12192\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/12141"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=12192"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=12192"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=12192"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}