{"id":119965,"date":"2021-08-10T07:31:08","date_gmt":"2021-08-10T07:31:08","guid":{"rendered":"https:\/\/www.edristi.in\/?p=119965"},"modified":"2021-08-10T07:31:10","modified_gmt":"2021-08-10T07:31:10","slug":"epc-package-of-waste-to-energy-facility-in-uttar-pradesh","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/epc-package-of-waste-to-energy-facility-in-uttar-pradesh\/","title":{"rendered":"EPC package of waste-to-energy facility in Uttar Pradesh"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Question : EPC package of waste-to-energy facility in Uttar Pradesh is expected to be commissioned at Ramna &#8212;<\/strong><br>a. By September 30, 2023<br>b. By September 30, 2021<br>c. By October 20, 2021<br>d. None of the above<br><strong>Ans. d.<br>Related facts &#8212;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>EPC package of waste-to-energy facility in Uttar Pradesh is expected to be commissioned at Ramna by September 30, 2022.<\/li><li>For this purpose the bids commenced on June 22.<\/li><li>&#8220;NTPC Vidyut Vyapar Nigam Ltd&#8221; had invited online bids on a two-stage bidding basis for the EPC (engineering-procurement-construction) package of waste-to-energy facility.<\/li><li>A waste-to-energy plant with waste segregation facility of 600 tonnes per day fresh Municipal Solid Waste will be installed under the project.<\/li><\/ul>\n\n\n\n<p class=\"has-text-align-right wp-block-paragraph\"><strong>By &#8212; Pankaj Pandey.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Link:<\/strong><br><a href=\"https:\/\/economictimes.indiatimes.com\/industry\/energy\/power\/ntpc-invites-online-bids-for-epc-package-of-waste-to-energy-facility-in-uttar-pradesh\/articleshow\/84471374.cms\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/economictimes.indiatimes.com\/industry\/energy\/power\/ntpc-invites-online-bids-for-epc-package-of-waste-to-energy-facility-in-uttar-pradesh\/articleshow\/84471374.cms<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question : EPC package of waste-to-energy facility in Uttar Pradesh is expected to be commissioned at Ramna &#8212;a. By September 30, 2023b. By September 30, 2021c. By October 20, 2021d. None of the aboveAns. d.Related facts &#8212; EPC package of waste-to-energy facility in Uttar Pradesh is expected to be commissioned at Ramna by September 30, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":119966,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[1121],"tags":[2344],"class_list":["post-119965","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nnews","tag-national"],"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/phvHKS-vcV","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.edristi.in\/wp-content\/uploads\/2021\/08\/EPC-package-of-waste-to-energy-facility-in-Uttar-Pradesh.png?fit=300%2C203&ssl=1","_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/119965","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=119965"}],"version-history":[{"count":1,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/119965\/revisions"}],"predecessor-version":[{"id":119967,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/119965\/revisions\/119967"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/119966"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=119965"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=119965"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=119965"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}