{"id":114176,"date":"2021-05-31T06:58:46","date_gmt":"2021-05-31T06:58:46","guid":{"rendered":"https:\/\/www.edristi.in\/?p=114176"},"modified":"2021-05-31T06:58:49","modified_gmt":"2021-05-31T06:58:49","slug":"ladakhgets-centres-nod-for-transmission-lines","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/ladakhgets-centres-nod-for-transmission-lines\/","title":{"rendered":"Ladakhgets Centre&#8217;s nod for transmission lines"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Question: Ladakh recently gets Centre&#8217;s nod for transmission lines at revised cost of &#8212;<\/strong><br>A. Rs1,310crore<br>B. Rs1,610crore<br>C. Rs1,000crore<br>(d) None of the above<br><strong>Answer- (a)<br>Related facts<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Ladakh has recently (May 2021)got Centre&#8217;s nod for transmission lines at revised cost of Rs 1,310 crore.<\/li><li>These transmission lines will link far-flung villages of Ladakh to the grid and phase out DG sets towards achieving carbon neutrality in the Union Territory.<\/li><li>The project on completion would also provide the army and the far-flung villages with clean power round the clock.<\/li><li>The DPR cost of the projects has been revised from Rs 354.74 crore to Rs 1,309.71 crore by the Central Electricity Authority.<\/li><\/ul>\n\n\n\n<p class=\"has-text-align-right wp-block-paragraph\"><strong>By &#8212; Pankaj Pandey.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Link:<\/strong><br><a href=\"https:\/\/wap.business-standard.com\/article-amp\/current-affairs\/ladakh-gets-centre-s-nod-for-transmission-lines-at-cost-of-rs-1-310-cr-121052900415_1.html\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/wap.business-standard.com\/article-amp\/current-affairs\/ladakh-gets-centre-s-nod-for-transmission-lines-at-cost-of-rs-1-310-cr-121052900415_1.html<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question: Ladakh recently gets Centre&#8217;s nod for transmission lines at revised cost of &#8212;A. Rs1,310croreB. Rs1,610croreC. Rs1,000crore(d) None of the aboveAnswer- (a)Related facts Ladakh has recently (May 2021)got Centre&#8217;s nod for transmission lines at revised cost of Rs 1,310 crore. These transmission lines will link far-flung villages of Ladakh to the grid and phase out [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":114177,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1121],"tags":[2344],"class_list":["post-114176","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nnews","tag-national"],"_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/114176","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=114176"}],"version-history":[{"count":1,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/114176\/revisions"}],"predecessor-version":[{"id":114178,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/114176\/revisions\/114178"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/114177"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=114176"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=114176"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=114176"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}