{"id":111434,"date":"2021-04-03T12:03:10","date_gmt":"2021-04-03T12:03:10","guid":{"rendered":"https:\/\/www.edristi.in\/?p=111434"},"modified":"2021-04-03T12:03:12","modified_gmt":"2021-04-03T12:03:12","slug":"indias-biggest-floating-solar-power-plant-coming-up-in-telangana","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/indias-biggest-floating-solar-power-plant-coming-up-in-telangana\/","title":{"rendered":"India&#8217;s biggest floating solar power plant coming up in Telangana"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Question- Which one of the following states is going to set up India\u2019s biggest floating solar plant?<\/strong><br>(a) Telangana<br>(b) Tamil Naidu<br>(c) Uttar Pradesh<br>(d) Madhya Pradesh<br><strong>Ans. (a)<br>Related facts-<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>India&#8217;s biggest floating solar power plant with a capacity of 100 megawatt is expected to become operational in Telangana in May.<\/li><li>The project has been set up by the energy conglomerate National Thermal Power Corporation (NTPC) in the reservoir of its thermal power plant at Ramagundam, Peddapalli district.<\/li><li>The solar photo-voltaic project, spread over 450 acres, will have 4.5 lakh photovoltaic panels and it can be expanded in the future.<\/li><li>The project has been set up at a cost of \u20b9423 crore.<\/li><li>The NTPC plans solar power plants of the total capacity of 450 MW in the southern region. Of this, 217 MW plants would be floating on water bodies.<\/li><li>Officials say the solar powers project are in line with the country&#8217;s commitment to attain the target of 175 GW of installed renewable energy capacity by 2022 including 100 GW of solar installed capacity.<\/li><\/ul>\n\n\n\n<p class=\"has-text-align-right wp-block-paragraph\"><strong>By- Yogesh Pratap Singh<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Reference- <\/strong><a href=\"https:\/\/timesofindia.indiatimes.com\/business\/india-business\/indias-biggest-floating-solar-power-plant-coming-up-in-telengana\/articleshow\/81874686.cms.\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/timesofindia.indiatimes.com\/business\/india-business\/indias-biggest-floating-solar-power-plant-coming-up-in-telengana\/articleshow\/81874686.cms.<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question- Which one of the following states is going to set up India\u2019s biggest floating solar plant?(a) Telangana(b) Tamil Naidu(c) Uttar Pradesh(d) Madhya PradeshAns. (a)Related facts- India&#8217;s biggest floating solar power plant with a capacity of 100 megawatt is expected to become operational in Telangana in May. The project has been set up by the [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":111435,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":"","jetpack_publicize_message":"","jetpack_publicize_feature_enabled":true,"jetpack_social_post_already_shared":true,"jetpack_social_options":{"image_generator_settings":{"template":"highway","default_image_id":0,"font":"","enabled":false},"version":2},"jetpack_post_was_ever_published":false},"categories":[1121],"tags":[2344],"class_list":["post-111434","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-nnews","tag-national"],"jetpack_publicize_connections":[],"jetpack_shortlink":"https:\/\/wp.me\/phvHKS-sZk","jetpack_likes_enabled":true,"jetpack_sharing_enabled":true,"jetpack_featured_media_url":"https:\/\/i0.wp.com\/www.edristi.in\/wp-content\/uploads\/2021\/04\/Indias-biggest-floating-solar-power-plant-coming-up-in-Telangana.png?fit=250%2C164&ssl=1","_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/111434","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=111434"}],"version-history":[{"count":1,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/111434\/revisions"}],"predecessor-version":[{"id":111436,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/111434\/revisions\/111436"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/111435"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=111434"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=111434"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=111434"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}