{"id":109000,"date":"2021-02-19T14:24:22","date_gmt":"2021-02-19T14:24:22","guid":{"rendered":"https:\/\/www.edristi.in\/?p=109000"},"modified":"2021-02-19T14:24:23","modified_gmt":"2021-02-19T14:24:23","slug":"kameng-hydro-electric-project","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/kameng-hydro-electric-project\/","title":{"rendered":"Kameng Hydro-Electric Project"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>Question- In which state is the Kameng Hydroelectric Project located?<\/strong><br>(a) Sikkim<br>(b) Tripura<br>(c) Nagaland<br>(d) Arunachal Pradesh<br><strong>Answer &#8211; (d)<br>Related facts<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>State-run power producer NTPC has recently(February 2021) said the fourth 150 mega watt (MW) unit of Kameng Hydro-Electric Project of its subsidiary North Eastern Electric Power Corporation is commercially operational.<\/li><li>About the project<\/li><li>Consequent upon successful commissioning, unit-4 of 150 MW of Kameng Hydro-Electric Project (4&#215;150 MW) of North Eastern Electric Power Corporation Ltd (a wholly owned subsidiary company of NTPC Ltd) has been declared on commercial operation with effect from February 12.<\/li><li>With this, the commissioned and commercial capacity of NTPC group has become 64,075 MW.<\/li><\/ul>\n\n\n\n<p class=\"has-text-align-right wp-block-paragraph\"><strong>By &#8212; Pankaj Pandey.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Link:<\/strong><br><a href=\"https:\/\/www.outlookindia.com\/newsscroll\/ntpc-kameng-projects-4th-150-mw-unit-commercially-operational\/2028343\" target=\"_blank\" rel=\"noreferrer noopener\">https:\/\/www.outlookindia.com\/newsscroll\/ntpc-kameng-projects-4th-150-mw-unit-commercially-operational\/2028343<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question- In which state is the Kameng Hydroelectric Project located?(a) Sikkim(b) Tripura(c) Nagaland(d) Arunachal PradeshAnswer &#8211; (d)Related facts State-run power producer NTPC has recently(February 2021) said the fourth 150 mega watt (MW) unit of Kameng Hydro-Electric Project of its subsidiary North Eastern Electric Power Corporation is commercially operational. About the project Consequent upon successful commissioning, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":109001,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1143],"tags":[2486],"class_list":["post-109000","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pp","tag-planning-and-project"],"_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/109000","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=109000"}],"version-history":[{"count":1,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/109000\/revisions"}],"predecessor-version":[{"id":109002,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/109000\/revisions\/109002"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/109001"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=109000"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=109000"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=109000"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}