{"id":10034,"date":"2016-03-22T07:01:30","date_gmt":"2016-03-22T07:01:30","guid":{"rendered":"https:\/\/www.edristi.in\/?p=10034"},"modified":"2016-03-22T07:01:30","modified_gmt":"2016-03-22T07:01:30","slug":"bellary","status":"publish","type":"post","link":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/bellary\/","title":{"rendered":"Bellary"},"content":{"rendered":"<p style=\"text-align: justify;\"><strong>Question: What is the capacity of first\u00a0super-critical\u00a0thermal unit commissioned by Bharat Heavy Electricals\u00a0(BHEL) on 4 March 2016 at Bellary Thermal Power Project (TPP) in Karnataka?<\/strong><br \/>\n(a) 700 Megawatt<br \/>\n(b) 1050 Megawatt<br \/>\n(c) 1225 Megawatt<br \/>\n(d) 800 Megawatt<br \/>\n<strong>Ans (a)<\/strong><br \/>\n<strong>Related facts:<\/strong><\/p>\n<ul style=\"text-align: justify;\">\n<li>On 4 March 2016 Bharat Heavy Electricals (BHEL) has commissioned its first 700 megawatts super-critical thermal unit at Bellary Thermal Power Project (TPP) in Karnataka.<\/li>\n<li>The order for the Bellary project of Karnataka Power Corporation Limited (KPCL) was won by BHEL through international competitive bidding on engineering, procurement and construction basis.<\/li>\n<li>Notably, this is the third unit commissioned by BHEL\u00a0at Bellary, where two units of 500 MW supplied and executed by\u00a0BHEL, are already in operation but these are not super-critical thermal unit.<\/li>\n<li>BHEL has supplied and executed 3,210 MW of sets in the Karnataka so far, which account for 94% of the coal-based installed capacity of Karnataka Power Corporation Limited (KPCL).<\/li>\n<li>BHEL is presently executing a 2 x 800 MW super-critical thermal power project at Yeramarus and the 370 MW gas-based Yelahanka Combined Cycle Power Project.<\/li>\n<li>BHEL has already commissioned 6,716 MW in the current financial year.<\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><strong>Reference:<\/strong><br \/>\n<a href=\"http:\/\/www.bhel.com\/press_release\/press_pop.php?press_id=816\">http:\/\/www.bhel.com\/press_release\/press_pop.php?press_id=816<\/a><br \/>\n<a href=\"http:\/\/www.poweronline.com\/doc\/bhel-first-mw-supercritical-thermal-unit-in-karnataka-0001\">http:\/\/www.poweronline.com\/doc\/bhel-first-mw-supercritical-thermal-unit-in-karnataka-0001<\/a><br \/>\n<a href=\"http:\/\/www.business-standard.com\/article\/news-cm\/bhel-gains-after-commissioning-supercritical-thermal-unit-in-karnataka-116030400685_1.html\">http:\/\/www.business-standard.com\/article\/news-cm\/bhel-gains-after-commissioning-supercritical-thermal-unit-in-karnataka-116030400685_1.html<\/a><br \/>\n<a href=\"http:\/\/www.thehindu.com\/news\/cities\/Tiruchirapalli\/bhel-commissions-thermal-unit-in-karnataka\/article8316263.ece\">http:\/\/www.thehindu.com\/news\/cities\/Tiruchirapalli\/bhel-commissions-thermal-unit-in-karnataka\/article8316263.ece<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Question: What is the capacity of first\u00a0super-critical\u00a0thermal unit commissioned by Bharat Heavy Electricals\u00a0(BHEL) on 4 March 2016 at Bellary Thermal Power Project (TPP) in Karnataka? (a) 700 Megawatt (b) 1050 Megawatt (c) 1225 Megawatt (d) 800 Megawatt Ans (a) Related facts: On 4 March 2016 Bharat Heavy Electricals (BHEL) has commissioned its first 700 megawatts [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10008,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1149],"tags":[],"class_list":["post-10034","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pls"],"_links":{"self":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/10034","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/comments?post=10034"}],"version-history":[{"count":0,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/posts\/10034\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media\/10008"}],"wp:attachment":[{"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/media?parent=10034"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/categories?post=10034"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.edristi.in\/hi\/%e0%a4%b9%e0%a5%8b%e0%a4%ae\/wp-json\/wp\/v2\/tags?post=10034"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}